{"id":430,"date":"2018-06-11T13:10:58","date_gmt":"2018-06-11T13:10:58","guid":{"rendered":"http:\/\/eigenbau.co.za\/?post_type=project&#038;p=430"},"modified":"2018-07-17T07:57:56","modified_gmt":"2018-07-17T07:57:56","slug":"c241-upgrade-existing-upington-wtw","status":"publish","type":"project","link":"https:\/\/eigenbau.co.za\/?project=c241-upgrade-existing-upington-wtw","title":{"rendered":"Upington Upgrade Existing WTW"},"content":{"rendered":"<p>[et_pb_section bb_built=&#8221;1&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text _builder_version=&#8221;3.1.1&#8243;]<\/p>\n<h3>Upington Upgrade Existing WTW<\/h3>\n<p>&nbsp;<\/p>\n<p><strong>Project Value:\u00a0<\/strong>R 5,398,186.60<\/p>\n<p><strong>Client:\u00a0<\/strong>Khara Hais Municipality<\/p>\n<p><strong>Completion Date:\u00a0<\/strong>2011<\/p>\n<p><strong>Consulting Engineer:\u00a0<\/strong>BVI Consulting<\/p>\n<p>Eigenbau was responsible for all the mechanical equipment supply, installation, commissioning, testing and putting into operation. This included false-floors for the sand filters (filters constructed by others), pumps, piping, bulk lime handling and dosing, new chlorine disinfection system and all Control, Electrical and Instrumentation (CE&amp;I) associated with the works.<\/p>\n<p>&nbsp;<\/p>\n<h3>Gallery Unavailable<\/h3>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section bb_built=&#8221;1&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text _builder_version=&#8221;3.1.1&#8243;] Upington Upgrade Existing WTW &nbsp; Project Value:\u00a0R 5,398,186.60 Client:\u00a0Khara Hais Municipality Completion Date:\u00a02011 Consulting Engineer:\u00a0BVI Consulting Eigenbau was responsible for all the mechanical equipment supply, installation, commissioning, testing and putting into operation. This included false-floors for the sand filters (filters constructed by others), pumps, piping, bulk lime handling and dosing, new [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":618,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"<h3>Upington Upgrade Existing WTW (C241)<\/h3><p>\u00a0<\/p><p><strong>Project Value:\u00a0<\/strong>R 5,398,186.60<\/p><p><strong>Client:\u00a0<\/strong>Khara Hais Municipality<\/p><p><strong>Completion Date:\u00a0<\/strong>2011<\/p><p><strong>Consulting Engineer:\u00a0<\/strong>BVI Consulting<\/p><p>Eigenbau was responsible for all the mechanical equipment supply, installation, commissioning, testing and putting into operation. This included false-floors for the sand filters (filters constructed by others), pumps, piping, bulk lime handling and dosing, new chlorine disinfection system and all Control, Electrical and Instrumentation (CE&I) associated with the works.<\/p><p>\u00a0<\/p><h3>Gallery Unavailable<\/h3>"},"project_category":[10],"project_tag":[],"_links":{"self":[{"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/project\/430"}],"collection":[{"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/project"}],"about":[{"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=430"}],"version-history":[{"count":7,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/project\/430\/revisions"}],"predecessor-version":[{"id":650,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/project\/430\/revisions\/650"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/media\/618"}],"wp:attachment":[{"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=430"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_category&post=430"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_tag&post=430"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}