{"id":417,"date":"2018-06-25T12:20:27","date_gmt":"2018-06-25T12:20:27","guid":{"rendered":"http:\/\/eigenbau.co.za\/?post_type=project&#038;p=417"},"modified":"2018-10-22T09:31:44","modified_gmt":"2018-10-22T07:31:44","slug":"c279-zuikerbosch-pumping-station","status":"publish","type":"project","link":"https:\/\/eigenbau.co.za\/?project=c279-zuikerbosch-pumping-station","title":{"rendered":"Zuikerbosch Pumping Station"},"content":{"rendered":"<p>[et_pb_section bb_built=&#8221;1&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text _builder_version=&#8221;3.1.1&#8243;]<\/p>\n<h3 style=\"text-align: center\">Zuikerbosch Pumping Station<\/h3>\n<h3 style=\"text-align: center\">Upgrading of Station 3 Flocculation and Sedimentation Capacity<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-695\" src=\"http:\/\/eigenbau.co.za\/wp-content\/uploads\/2018\/06\/20181011_132215-300x169.jpg\" alt=\"\" width=\"601\" height=\"338\" srcset=\"https:\/\/eigenbau.co.za\/wp-content\/uploads\/2018\/06\/20181011_132215-300x169.jpg 300w, https:\/\/eigenbau.co.za\/wp-content\/uploads\/2018\/06\/20181011_132215-768x432.jpg 768w, https:\/\/eigenbau.co.za\/wp-content\/uploads\/2018\/06\/20181011_132215-1024x576.jpg 1024w, https:\/\/eigenbau.co.za\/wp-content\/uploads\/2018\/06\/20181011_132215-1080x608.jpg 1080w\" sizes=\"(max-width: 601px) 100vw, 601px\" \/><\/p>\n<p><strong>Project Value:\u00a0<\/strong>R 94,492,338.70<\/p>\n<p><strong>Client:\u00a0<\/strong>Rand Water<\/p>\n<p><strong>Completion Date:\u00a0<\/strong>2016<\/p>\n<p><strong>Consulting Engineer:\u00a0<\/strong>WorleyParsons<\/p>\n<p>Rand Water&#8217;s Zuikerbosch Station 3 Flocculation and Sedimentation capacity needed to be upgraded by 400 000 000L\/day. Eigenbau was not the originally appointed contractor was called in when the original contractor was unable to complete the works. Due to our extensive project management experience and high levels of engineering competence, we were able to turn this complex project into a success for Rand Water.<\/p>\n<p>The scope of work was to complete construction of the flocculator, connection channels and sedimentation tanks (the structures for which were at various stages of completion) together with the inlet and outlet pipework. Eigenbau also installed free-issued valves and sluices. Eigenbau was responsible for testing, commissioning and successfully putting into operation of the entire upgrade.<\/p>\n<p>[\/et_pb_text][et_pb_gallery _builder_version=&#8221;3.1.1&#8243; posts_number=&#8221;5&#8243; show_title_and_caption=&#8221;off&#8221; zoom_icon_color=&#8221;#2ea3f2&#8243; hover_overlay_color=&#8221;rgba(255,255,255,0.9)&#8221; gallery_ids=&#8221;695,694,692,691,690&#8243; \/][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section bb_built=&#8221;1&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text _builder_version=&#8221;3.1.1&#8243;] Zuikerbosch Pumping Station Upgrading of Station 3 Flocculation and Sedimentation Capacity Project Value:\u00a0R 94,492,338.70 Client:\u00a0Rand Water Completion Date:\u00a02016 Consulting Engineer:\u00a0WorleyParsons Rand Water&#8217;s Zuikerbosch Station 3 Flocculation and Sedimentation capacity needed to be upgraded by 400 000 000L\/day. Eigenbau was not the originally appointed contractor was called in when the original contractor [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":695,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"<h3>Zuikerbosch Pumping Station (C279)<\/h3><h3>Upgrading of Station 3 Flocculation and Sedimentation Capacity<\/h3><p><strong>Project Value:\u00a0<\/strong>R 94,492,338.70<\/p><p><strong>Client:\u00a0<\/strong>Rand Water<\/p><p><strong>Completion Date:\u00a0<\/strong>2016<\/p><p><strong>Consulting Engineer:\u00a0<\/strong>WorleyParsons<\/p><p>Rand Water's Zuikerbosch Station 3 Flocculation and Sedimentation capacity needed to be upgraded by 400 000 000L\/day. Eigenbau was not the originally appointed contractor was called in when the original contractor was unable to complete the works. Due to our extensive project management experience and high levels of engineering competence, we were able to turn this complex project into a success for Rand Water.<\/p><p>The scope of work was to complete construction of the flocculator, connection channels and sedimentation tanks (the structures for which were at various stages of completion) together with the inlet and outlet pipework. Eigenbau also installed free-issued valves and sluices. Eigenbau was responsible for testing, commissioning and successfully putting into operation of the entire upgrade.<\/p><p>\u00a0<\/p><h3>Gallery Unavailable<\/h3>"},"project_category":[10],"project_tag":[],"_links":{"self":[{"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/project\/417"}],"collection":[{"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/project"}],"about":[{"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=417"}],"version-history":[{"count":15,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/project\/417\/revisions"}],"predecessor-version":[{"id":679,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/project\/417\/revisions\/679"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=\/wp\/v2\/media\/695"}],"wp:attachment":[{"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=417"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_category&post=417"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/eigenbau.co.za\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_tag&post=417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}